project implementation scheduling
常見例句
- These are the theory and specific implementation of optimization the project organization model, scheduling, quality, risk and cost combinatorial controlling.
引入進度、質(zhì)量、風(fēng)險、成本聯(lián)合控制思路以及具體措施和方法。 - To reduce the risk of project implementation failure brought by unsuitable project schedule, temporal constraint network was applied to the research of project scheduling.
為了降低由進度安排不當(dāng)導(dǎo)致項目實施失敗的風(fēng)險,將時間約束網(wǎng)絡(luò)應(yīng)用到項目實施進度計劃研究中。 返回 project implementation scheduling